Case Studies

Discover how leading companies optimize their processes and achieve measurable success with PSsystec.
cable-outage-construction-side

Resilient Energy and Device Testing During Network Cable Outage

2 days
of complete on-site internet outage
100%
system uptime for all PSsystec test and showcase systems
View Case Study
atms

Centrally monitor power outages of IT routers

14.500
Locations
> 99%
System availability
View Case Study
gas plant

Process and condition monitoring of gas plants

> 2000
Monitored gas systems
50%
Reduction of unplanned service operations
View Case Study
sewage treatment plant

Monitoring of Drinking Water and Sewage Networks

100,000
Residents
100
Technicians
View Case Study
Cellular tower

Fault management for decentralized plant technology and infrastructure

1.800
Locations
40
Potential-free inputs per gateway
View Case Study
fuse box

Digitize energy meters via Modbus

> 200.000
Electricity consumption points
Up to 10%
Energy savings
View Case Study
Supermarket refrigerated rack

Managing branch networks in an energy-efficient way

600
Venues
2,000+
Employees and Partners
View Case Study
Contact

Direct Sales Contact

For product enquiries, pricing and individual configurations.

Horst Lange

Head of Sales